Auction Results from the Procedure for the Available Transmission Capacity Allocation and the Commercial Transmission Rights for the Bulgarian interconnections with Romania, Greece, Serbia, Macedonia and Turkey Awarded for the Period from 00:00 h. (СЕT) on June 01, 2012 to 24:00 h. (СЕT) on June 30, 2012 |
| |
|
|
|
| |
|
|
|
| |
Border: |
Bulgaria-Romania |
|
| |
Period: |
01 june - 10 june 2012 |
|
| |
Ref № |
MB-20120600-BGRO-01A |
|
| |
CLEARING PRICE (€/MW×h): |
0.11 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
ALPIQ ENERGY SE |
27XALPIQ-ENERGYS |
45 |
| 2 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
30 |
| 3 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
30 |
| 4 |
Energy Financing Team (Switzerland) AG |
12XEFT-SWITZERLR |
30 |
| 5 |
ENERGO-PRO BULGARIA TRADING EAD |
32X001100100373M |
20 |
| 6 |
EZPADA s.r.o. |
11XEZPADAHANDELC |
10 |
| 7 |
GEN-I SOFIA - ELECTRICITY TRADING AND SALES |
32X001100100239Q |
10 |
| 8 |
RE POWER CESKA REPUBLIKA s.r.o. |
27X-RAETIACZ---E |
11 |
| 9 |
RUDNAP GROUP BULGARIA Ltd |
32X001100100261X |
4 |
| 10 |
STATKRAFT MARKETS GMBH |
11XSTATKRAFT001N |
10 |
| |
|
TOTAL: |
200 |
| |
|
Available Transmission Capacity: |
200 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
|
|
| |
|
|
|
| |
Border: |
Bulgaria-Romania |
|
| |
Period: |
11 june - 30 june 2012 |
|
| |
Ref № |
MB-20120600-BGRO-02A |
|
| |
CLEARING PRICE (€/MW×h): |
0.55 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
ALPIQ ENERGY SE |
27XALPIQ-ENERGYS |
25 |
| 2 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
10 |
| 3 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
10 |
| 4 |
Energy Financing Team (Switzerland) AG |
12XEFT-SWITZERLR |
30 |
| 5 |
ENERGO-PRO BULGARIA TRADING EAD |
32X001100100373M |
9 |
| 6 |
EZPADA s.r.o. |
11XEZPADAHANDELC |
8 |
| 7 |
GEN-I SOFIA - ELECTRICITY TRADING AND SALES |
32X001100100239Q |
48 |
| 8 |
RE POWER CESKA REPUBLIKA s.r.o. |
27X-RAETIACZ---E |
10 |
| |
|
TOTAL: |
150 |
| |
|
Available Transmission Capacity: |
150 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
|
|
| |
|
|
|
| |
Border: |
Romania-Bulgaria |
|
| |
Period: |
01 june - 03 june 2012 |
|
| |
Ref № |
MB-20120600-ROBG-01A |
|
| |
CLEARING PRICE (€/MW×h): |
0.03 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
20 |
| 2 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
30 |
| 3 |
Energy Financing Team (Switzerland) AG |
12XEFT-SWITZERLR |
40 |
| 4 |
ENERGO-PRO BULGARIA TRADING EAD |
32X001100100373M |
10 |
| 5 |
GEN-I SOFIA - ELECTRICITY TRADING AND SALES |
32X001100100239Q |
20 |
| 6 |
RE POWER CESKA REPUBLIKA s.r.o. |
27X-RAETIACZ---E |
10 |
| 7 |
STATKRAFT MARKETS GMBH |
11XSTATKRAFT001N |
10 |
| 8 |
OET OOD |
32XOET-OOD-----5 |
20 |
| |
|
TOTAL: |
160 |
| |
|
Available Transmission Capacity: |
160 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
| |
|
|
|
| |
Border: |
Romania-Bulgaria |
|
| |
Period: |
04 june - 04 june 2012 |
|
| |
Ref № |
MB-20120600-ROBG-02A |
|
| |
CLEARING PRICE (€/MW×h): |
0.04 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
20 |
| 2 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
10 |
| 3 |
Energy Financing Team (Switzerland) AG |
12XEFT-SWITZERLR |
40 |
| 4 |
ENERGO-PRO BULGARIA TRADING EAD |
32X001100100373M |
10 |
| 5 |
RE POWER CESKA REPUBLIKA s.r.o. |
27X-RAETIACZ---E |
10 |
| 6 |
OET OOD |
32XOET-OOD-----5 |
20 |
| |
|
TOTAL: |
110 |
| |
|
Available Transmission Capacity: |
110 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
| |
|
|
|
| |
Border: |
Romania-Bulgaria |
|
| |
Period: |
05 june - 15 june 2012 |
|
| |
Ref № |
MB-20120600-ROBG-03A |
|
| |
CLEARING PRICE (€/MW×h): |
0.08 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
22 |
| 2 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
1 |
| 3 |
Energy Financing Team (Switzerland) AG |
12XEFT-SWITZERLR |
2 |
| 4 |
ENERGO-PRO BULGARIA TRADING EAD |
32X001100100373M |
5 |
| 5 |
RE POWER CESKA REPUBLIKA s.r.o. |
27X-RAETIACZ---E |
10 |
| 6 |
OET OOD |
32XOET-OOD-----5 |
20 |
| |
|
TOTAL: |
60 |
| |
|
Available Transmission Capacity: |
60 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
| |
|
| |
Border: |
Romania-Bulgaria |
|
| |
Period: |
16 june - 24 june 2012 |
|
| |
Ref № |
MB-20120600-ROBG-04A |
|
| |
CLEARING PRICE (€/MW×h): |
0.04 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
30 |
| 2 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
10 |
| 3 |
Energy Financing Team (Switzerland) AG |
12XEFT-SWITZERLR |
30 |
| 4 |
ENERGO-PRO BULGARIA TRADING EAD |
32X001100100373M |
10 |
| 5 |
RE POWER CESKA REPUBLIKA s.r.o. |
27X-RAETIACZ---E |
10 |
| 6 |
OET OOD |
32XOET-OOD-----5 |
20 |
| |
|
TOTAL: |
110 |
| |
|
Available Transmission Capacity: |
110 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
| |
|
| |
Border: |
Romania-Bulgaria |
|
| |
Period: |
25 june - 30 june 2012 |
|
| |
Ref № |
MB-20120600-ROBG-05A |
|
| |
CLEARING PRICE (€/MW×h): |
0.08 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
14 |
| 2 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
3 |
| 3 |
Energy Financing Team (Switzerland) AG |
12XEFT-SWITZERLR |
6 |
| 4 |
ENERGO-PRO BULGARIA TRADING EAD |
32X001100100373M |
7 |
| 5 |
RE POWER CESKA REPUBLIKA s.r.o. |
27X-RAETIACZ---E |
10 |
| 6 |
OET OOD |
32XOET-OOD-----5 |
20 |
| |
|
TOTAL: |
60 |
| |
|
Available Transmission Capacity: |
60 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
| |
|
| |
Border: |
Bulgaria-Greece |
|
| |
Period: |
01 june - 30 june 2012 |
|
| |
Ref № |
MB-20120600-BGGR-01A |
|
| |
CLEARING PRICE (€/MW×h): |
1.51 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
10 |
| 2 |
EDISON TRADING S.P.A. BULGARIA BRANCH |
11XEDISON-TRADES |
5 |
| 3 |
GEN-I SOFIA - ELECTRICITY TRADING AND SALES |
32X001100100239Q |
20 |
| 4 |
OET OOD |
32XOET-OOD-----5 |
10 |
| 5 |
PUBLIC POWER CORPORATION S.A. |
11XPPCDDE9-----D |
30 |
| 6 |
REVAMENA MEPE |
29XSUNINNOVATIOD |
10 |
| 7 |
PROTERGIA S.A. |
29XPROTERGIA-SA9 |
5 |
| 8 |
STATKRAFT MARKETS GMBH |
11XSTATKRAFT001N |
10 |
| |
|
TOTAL: |
100 |
| |
|
Available Transmission Capacity: |
100 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
| |
Border: |
Bulgaria-Greece |
|
| |
Period: |
09 june - 30 june 2012 |
|
| |
Ref № |
MB-20120600-BGGR-02A |
|
| |
CLEARING PRICE (€/MW×h): |
2.87 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
EDISON TRADING s.p.a. Bulgaria branch |
11XEDISON-TRADES |
7 |
| 2 |
GEN-I SOFIA - ELECTRICITY TRADING AND SALES |
32X001100100239Q |
26 |
| 3 |
PUBLIC POWER CORPORATION S.A. |
11XPPCDDE9-----D |
32 |
| 4 |
ENERGY SUPPLY EOOD |
32XESUPPLY-BGSFK |
10 |
| 5 |
PROTERGIA S.A. |
29XPROTERGIA-SA9 |
5 |
| 6 |
REVAMENA MEPE |
29XSUNINNOVATIOD |
10 |
| 7 |
ELPEDISON TRADING S.A. |
29XELPEDISONTR-G |
10 |
| |
|
TOTAL: |
100 |
| |
|
Available Transmission Capacity: |
100 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
|
|
| |
Border: |
Greece-Bulgaria |
|
| |
Period: |
01 june - 30 june 2012 |
|
| |
Ref № |
MB-20120600-GRBG-01A |
|
| |
CLEARING PRICE (€/MW×h): |
0.00 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
GEN-I SOFIA - ELECTRICITY TRADING AND SALES |
32X001100100239Q |
10 |
| 2 |
ENERGY SUPPLY EOOD |
32XESUPPLY-BGSFK |
20 |
| 3 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
10 |
| 4 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
20 |
| |
|
TOTAL: |
60 |
| |
|
Available Transmission Capacity: |
100 |
| |
|
NON-ALLOCATED CAPACITY: |
40 |
| |
|
|
|
| |
|
|
|
| |
Border: |
Bulgaria-Serbia |
|
| |
Period: |
01 june - 30 june 2012 |
|
| |
Ref № |
MB-20120600-BGRS-01A |
|
| |
CLEARING PRICE (€/MW×h): |
0.90 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
20 |
| 2 |
ELEKTRICNI FINANCNI TIM d.o.o |
28XEFT-SI000000L |
35 |
| 3 |
EGL BULGARIA EAD |
32XEGL-BULGARIAC |
1 |
| 4 |
ENERGO-PRO BULGARIA TRADING EAD |
32X001100100373M |
10 |
| 5 |
EZPADA s.r.o. |
11XEZPADAHANDELC |
9 |
| 6 |
GEN-I SOFIA - ELECTRICITY TRADING AND SALES |
32X001100100239Q |
10 |
| 7 |
RUDNAP GROUP BULGARIA Ltd |
32X001100100261X |
10 |
| |
|
TOTAL: |
95 |
| |
|
Available Transmission Capacity: |
95 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
|
|
| |
|
|
|
| |
Border: |
Serbia-Bulgaria |
|
| |
Period: |
01 june - 30 june 2012 |
|
| |
Ref № |
MB-20120600-RSBG-01A |
|
| |
CLEARING PRICE (€/MW×h): |
0.03 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
10 |
| 2 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
15 |
| 3 |
ELEKTRICNI FINANCNI TIM d.o.o |
28XEFT-SI000000L |
20 |
| 4 |
ENERGO-PRO BULGARIA TRADING EAD |
32X001100100373M |
5 |
| 5 |
EVN TRADING SOUTH EAST EUROPE EAD |
32X-EVN-TSEE---K |
10 |
| 6 |
EZPADA s.r.o. |
11XEZPADAHANDELC |
10 |
| 7 |
GEN-I SOFIA - ELECTRICITY TRADING AND SALES |
32X001100100239Q |
20 |
| 8 |
RE POWER CESKA REPUBLIKA s.r.o. |
27X-RAETIACZ---E |
10 |
| 9 |
RUDNAP GROUP BULGARIA Ltd |
32X001100100261X |
10 |
| |
|
TOTAL: |
110 |
| |
|
Available Transmission Capacity: |
110 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
| |
|
| |
Border: |
Bulgaria-Macedonia |
|
| |
Period: |
01 june - 30 june 2012 |
|
| |
Ref № |
MB-20120600-BGMK-01A |
|
| |
CLEARING PRICE (€/MW×h): |
0.76 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
7 |
| 2 |
ENERGY FINANCING GROUP AD |
32XEFG-AD------N |
12 |
| 3 |
ELEKTRICNI FINANCNI TIM d.o.o |
28XEFT-SI000000L |
25 |
| 4 |
GEN-I SOFIA - ELECTRICITY TRADING AND SALES |
32X001100100239Q |
16 |
| 5 |
RITAM-4-BТ LTD |
32X001100100382L |
5 |
| 6 |
RUDNAP GROUP BULGARIA Ltd |
32X001100100261X |
10 |
| |
|
TOTAL: |
75 |
| |
|
Available Transmission Capacity: |
75 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
|
|
| |
|
|
|
| |
Border: |
Macedonia-Bulgaria |
|
| |
Period: |
01 june - 30 june 2012 |
|
| |
Ref № |
MB-20120600-MKBG-01A |
|
| |
CLEARING PRICE (€/MW×h): |
0.02 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
10 |
| 2 |
ELEKTRICNI FINANCNI TIM d.o.o |
28XEFT-SI000000L |
13 |
| 3 |
EZPADA s.r.o. |
11XEZPADAHANDELC |
2 |
| 4 |
GEN-I SOFIA - ELECTRICITY TRADING AND SALES |
32X001100100239Q |
10 |
| |
|
TOTAL: |
35 |
| |
|
Available Transmission Capacity: |
35 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
|
|
| |
|
|
|
| |
Border: |
Bulgaria-Turkey |
|
| |
Period: |
01 june - 30 june 2012 |
|
| |
Ref № |
MB-20120600-BGTR-01A |
|
| |
CLEARING PRICE (€/MW×h): |
7.05 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
EZPADA s.r.o. |
11XEZPADAHANDELC |
10 |
| 2 |
EGL BULGARIA EAD |
32XEGL-BULGARIAC |
10 |
| 3 |
GROUP TRANS ENERGY OOD |
32X0011001003141 |
30 |
| 4 |
ALPIQ ENERGY SE |
27XALPIQ-ENERGYS |
23 |
| 5 |
DANS ENERGY OOD |
32X001100100002K |
30 |
| 6 |
ENERGY SUPPLY EOOD |
32XESUPPLY-BGSFK |
30 |
| |
|
TOTAL: |
133 |
| |
|
Available Transmission Capacity: |
133 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
|
|
| |
|
|
|
| |
Border: |
Bulgaria-Turkey |
|
| |
Period: |
01 june - 08 june 2012 |
|
| |
Ref № |
MB-20120600-BGTR-02A |
|
| |
CLEARING PRICE (€/MW×h): |
3.76 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
EZPADA s.r.o. |
11XEZPADAHANDELC |
20 |
| 2 |
GEN-I SOFIA - ELECTRICITY TRADING AND SALES |
32X001100100239Q |
20 |
| 3 |
RE POWER CESKA REPUBLIKA s.r.o. |
27X-RAETIACZ---E |
10 |
| 4 |
STATKRAFT MARKETS GMBH |
11XSTATKRAFT001N |
5 |
| 5 |
EDISON TRADING S.P.A. BULGARIA BRANCH |
11XEDISON-TRADES |
5 |
| 6 |
GROUP TRANS ENERGY OOD |
32X0011001003141 |
7 |
| |
|
TOTAL: |
67 |
| |
|
Available Transmission Capacity: |
67 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
|
|
| |
|
|
|
| |
Border: |
Turkey-Bulgaria |
|
| |
Period: |
01 june - 30 june 2012 |
|
| |
Ref № |
MB-20120600-TRBG-01A |
|
| |
CLEARING PRICE (€/MW×h): |
0.02 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
26 |
| 2 |
ELEKTRICNI FINANCNI TIM d.o.o |
28XEFT-SI000000L |
15 |
| 3 |
EZPADA s.r.o. |
11XEZPADAHANDELC |
10 |
| 4 |
ENERGO-PRO BULGARIA TRADING EAD |
32X001100100373M |
10 |
| 5 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
10 |
| 6 |
EVN TRADING SOUTH EAST EUROPE EAD |
32X-EVN-TSEE---K |
10 |
| 7 |
RE POWER CESKA REPUBLIKA s.r.o. |
27X-RAETIACZ---E |
9 |
| 8 |
STATKRAFT MARKETS GMBH |
11XSTATKRAFT001N |
10 |
| |
|
TOTAL: |
100 |
| |
|
Available Transmission Capacity: |
100 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |
| |
|
| |
|
|
|
| |
Border: |
Turkey-Bulgaria |
|
| |
Period: |
01 june - 08 june 2012 |
|
| |
Ref № |
MB-20120600-TRBG-02A |
|
| |
CLEARING PRICE (€/MW×h): |
0.03 €/MW×h |
|
| |
|
|
|
| № |
Participant's Name |
EIC |
CTR acquired, MW |
| 1 |
DANSKE COMMODITIES A/S |
11XDANSKECOM---P |
16 |
| 2 |
ELEKTRICNI FINANCNI TIM d.o.o |
28XEFT-SI000000L |
15 |
| 3 |
EZPADA s.r.o. |
11XEZPADAHANDELC |
6 |
| 4 |
CEZ TRADE BULGARIA EAD |
32XCEZ-TRADE-BG3 |
10 |
| 5 |
RE POWER CESKA REPUBLIKA s.r.o. |
27X-RAETIACZ---E |
3 |
| |
|
TOTAL: |
50 |
| |
|
Available Transmission Capacity: |
50 |
| |
|
NON-ALLOCATED CAPACITY: |
0 |