Електроенергиен системен оператор
ProfileTechnical DataDispatchingElectricity MarketEnergy LegislationInformation
Auction Results for the ATC Allocation
For the Period from 01.06.2012 to 30.06.2012
For the Period from 01.04.2012 to 30.04.2012
For the Period from 01.05.2012 to 31.05.2012
For the Period from 01.03.2012 to 31.03.2012
For the Period from 01.02.2012 to 29.02.2012
For the Period from 01.01.2012 to 31.01.2012
For the Period from 01.01.2012 to 31.12.2012
Archive 2010
Archive 2011
Archive 2009
For the Period from 14.12.2009 to 20.12.2009
For the Period from 07.12.2009 to 13.12.2009
For the Period from 07.12.2009 to 31.12.2009
For the Period from 01.12.2009 to 31.12.2009
For the Period from 09.11.2009 to 30.11.2009
For the Period from 02.11.2009 to 30.11.2009
For the Period from 01.11.2009 to 30.11.2009
For the Period from 19.10.2009 to 31.10.2009
For the Period from 01.10.2009 to 31.10.2009
For the Period from 01.09.2009 to 30.09.2009
For the Period from 01.08.2009 to 31.08.2009
For the Period from 01.07.2009 to 31.07.2009
For the Period from 01.06.2009 to 30.06.2009
For the Period from 10.05.2009 to 18.05.2009
For the Period from 01.05.2009 to 31.05.2009
For the Period from 01.04.2009 to 30.04.2009
For the Period from 01.03.2009 to 31.03.2009
For the Period from 01.02.2009 to 28.02.2009
For the Period from 26.01.2009 to 31.01.2009
For the Period from 19.01.2009 to 31.01.2009
For the Period from 11.01.2010 to 31.01.2010
For the Period from 01.01.2009 to 11.01.2009
For the Period from 01.01.2009 to 31.01.2009
For the Period from 01.01.2009 to 31.12.2009
Archive 2008

Auction Results from the Procedure for the Available Transmission Capacity Allocation

  Auction Results from the Procedure for the Available Transmission Capacity Allocation and the Commercial Transmission Rights for the Bulgarian interconnections with Greece (GR) for the period from 00:00 a.m. on December 07, 2009 to 24:00 midnight on December 31, 2009 and on the interconnection of Bulgaria (BG) with Macedonia (FYROM) for the period from 00:00 a.m. on December 07, 2009 to 24:00 midnight on December 13, 2009.
       
       
  Border: Bulgaria-Macedonia  
  Period: 07 December - 13 December 2009  
  Reference Number 2009BG-FYROM-12--07-13  
  CLEARING PRICE: 0.00 €/MW×h  
       
Participant's Name EIC CTR acquired, MW 
1 NATSIONALNA ELEKTRICHESKA KOMPANIA EAD   32X-NEK-EAD----C 15
    TOTAL: 15
       
    Available Transmission Capacity: 15
    NON-ALLOCATED CAPACITY: 0
       
     
       
  Border: Bulgaria-Greece  
  Period: 07 December - 31 December 2009  
  Reference Number 2009BG-GR-12--07-31  
  CLEARING PRICE: 3.80 €/MW×h  
       
Participant's Name EIC CTR acquired, MW 
1 NATSIONALNA ELEKTRICHESKA KOMPANIA EAD   32X-NEK-EAD----C 50
    TOTAL: 50
       
    Available Transmission Capacity: 50